Quinn Piling was appointed by Walls Construction Limited to deliver the piling works associated with the expansion of the Novo Nordisk pharmaceutical facility in Athlone.
The project comprised the construction of a secant piled retaining wall to support an existing bank and facilitate development into the slope. In addition to the retaining structure, foundation piles were installed to support the wider development.
Working in hard, rocky ground conditions throughout the site, the project required the use of cased CFA piling techniques to achieve the required pile depths and performance criteria.
Piling Scope & Details
- Installation of 85no. 900mm diameter cased CFA secant wall piles.
- Secant wall constructed to retain the existing bank and enable construction into the slope.
- Installation of 28no. 610mm diameter cased CFA foundation piles.
- All piles installed in hard, rocky ground conditions.